enquiries@highwire.info

0161 612 7633

From fixings to hold 20 lifts of scaffold through to gate hoists we can design and install specialist structural fixings for any purpose.

Heatherley’s 2009 exhibition, Highwire supporting the arts

Includes:

  • Site survey – where applicable
  • Liaison with design team
  • Structural calculations
  • Design drawings
  • Supply and installation
  • User training
  • Operations and Maintenance Manual where applicable
  • 1 years certification where applicable

Cost structure: Costed staged proposal on receipt of brief.

City Tower Manchester 2005, fixings to hold 25 lifts of scaffold.

Comments are closed.