enquiries@highwire.info

0161 612 7633

Burnley Health Lift

Share

Contractor  

 

Eric Wright Group
A flagship development – the Burnley Health Lift. This was a £28 million pound health and leisure centre.

System Details

  • – Abseiling Track Systems supplied by Metreel Ltd, both internal and external envelopes of the structure.
  • – Cable Mansafe Systems supplied by Latchways PLC.
  • – Abseiling posts , bespoke design by Highwire Ltd.
  • – Faba Ladders supplied Metreel Ltd.

Project Details

Highwire Ltd worked in close conjunction with the “Eric Wright Group” and the Architects ” Nightingale Associates” to provide solutions to the Safe working at height & window cleaning tasks that were required. We worked closely with the Architect, Planning Supervisors and the Contractor to provide effective, economical solutions to allow safe working access for maintenance of the structure over its 25 year proposed lifespan.

The Solutions we envisaged and products we installed ensured safe access and practises to maintain and clean the external glazed facades / windows throughout the development. It also enabled safe access and practices for the maintenance of the roof areas / vents / gutters etc.

We ensure the best products that are available to us are installed on all our contracts. This is to provide our clients with a guarantee and quality assurance that is continuous from manufacture through to installation.

Comments (0) Case Studies

Read more